Zhejiang Xing Xing Energy MTO Catalyst Dust Extration Project

Lanke Provides tanks top dust extration system for the DMTO cell in phase I of 1,800,000 MT/YR DMTO project in Zhejiang Xing Xing Energy 300,000 MT/YR Polyethylene and 390,000 MT/YR propylene project, which includes tanks top dedusting of the fresh catalyst, the heated catalyst and the waste catalyst. With LPEC as the general contractor, the afford scope of Lanke included equipment, instrumentscontrol systems, pipes and pipe fittingsinstallation, training and guidance of stat-off and debugging, and the dust extration will be put into operation in March15th, 2015.